Direct Cost | F&A Cost |
|
|
Generally speaking, if the device is to be predominantly used for a project need, then it is allowable as a direct cost. If the device is to be used for an individual to address multiple needs, then it may be more appropriate as an F&A cost. Consider if the need for the device is project-driven or individual-driven.
Additional information about direct costs and F&A costs is available within the Uniform Guidance.